Active development roadmap

This is the ordered work queue after the 2.0 release. A milestone is complete only when its stated behavior, tests, and documentation agree. Development continues on focused branches from dev; only an approved promotion to main starts stable-release preparation. This page tracks the work we explicitly paused, not a promise to implement every possible language or library feature.

1. Restore green development CI

Completed (2026-10-03, dev at 641d29d): all five integrated development workflows pass. Hosted coverage is 92.09% (15,150 of 16,451 lines), above the unchanged 90% floor. The earlier multi-root LSP integration failure is no longer a failing gate.

The baseline failing run is GitHub Actions 37055126294; the coverage repair was merged through PR #2. Continue adding behavior tests as features land, without weakening the floor.

Visible finish line: five green dev workflows, including Coverage.

2. Establish an owner-operable maintenance handoff

Release-blocking and repository-split-blocking requirement: before Sagan is divided into independently versioned repositories, create and verify the maintainer handoff and project-survivability guide. Every repository must have a root-level MAINTAINERS.md that lets the owner operate that repository and understand its place in the complete ecosystem without relying on undocumented history, a particular contributor, or access to an AI assistant.

The handoff must document exact Bash commands and decision rules rather than high-level summaries. It must cover repository purpose and boundaries, directory topology, dependency direction, every sagan.toml and lock/index contract, local bootstrap and multi-repository workspace setup, build and test entry points, branch and commit conventions, direct work on dev, promotion to main, pull requests, CI workflows and recovery, version calculation, release and rollback procedures, documentation aggregation, deployment, secrets and external services, platform-specific behavior, troubleshooting, and disaster recovery. Commands, filenames, expected outputs, prerequisites, failure modes, and safe recovery steps must be kept current with the code.

No extraction milestone is complete merely because code was moved. The new repository must pass an owner-survivability drill from a clean checkout, and CI must reject missing required sections, stale command references, invalid links, or undocumented workflow entry points. Any change to a command, manifest, workflow, branch rule, release path, integration boundary, or deployment mechanism must update the affected MAINTAINERS.md in the same change.

Visible finish line: Joe can start from the organization landing page, follow only checked-in maintainer documentation, reproduce a complete local workspace, explain how all repositories connect, make and validate a safe change, interpret or repair CI, promote it according to policy, build the holistic documentation site, and recover the project from a new machine.

3. Fracture the repository without fracturing the project

Carry out the checked-in multi-repository fracture roadmap. The target organization contains independently versioned repositories for the language, VS Code extension, physics, rendering, holistic documentation, integrated workspace, and the application currently named Space Game. The workspace and documentation aggregators must preserve one-command development and one official documentation site across those boundaries.

Every extracted repository must satisfy the maintainer-handoff gate and begin with a root CODEX_START.md: a one-time prompt for a new Codex chat that teaches the agent both that repository and the Sagan ecosystem before work begins. Prompts must name the canonical files to read, dependency boundaries, workflow and validation commands, current compatibility metadata, and rules for preserving unrelated changes. A clean-chat onboarding drill must verify that each prompt produces an accurate repo map and safe first-step plan without depending on hidden conversation history. After that first chat reads the prompt, it deletes the tracked file through a reviewed PR into dev. AGENTS.md, TECHNOLOGY.md, MAINTAINERS.md, and the versioned maps retain the lasting onboarding and workflow knowledge.

Every prompt must preserve the owner's teaching-first preference: explain what to code, why, and how before offering to implement it. Planning, diagnosis, and design discussion are not implementation authorization. Before the owner explicitly declares the language secure, language implementation still requires a direct request. After that declaration, chats should teach and review rather than write language/tooling code; only rendering, physics, and Space Game code may be written, and only when explicitly requested.

Space Game becomes its own Sagan application repository. It must declare its required Sagan installation and package dependencies, own the canonical SPACE_GAME_DESIGN.md, and use that document as the sole source of game-design context. Its CODEX_START.md must invite a new chat to ask the owner as many clarifying questions as useful, both to understand the owner's goals and to help the owner deliberately resolve design and execution decisions. Confirmed decisions, exploratory ideas, and unresolved questions must remain distinct, and old chat history must not be a required source.

Visible finish line: every component has independent history, CI, versioning, issues, maintainer guidance, and new-chat onboarding; a clean workspace can build the locked ecosystem and Space Game; all component docs publish into the official Sagan site; and the owner can operate the result without undocumented cross-repository knowledge.

Post-publication status (2026-10-05): all seven public repositories exist. The cross-repository tracking issue records remaining independent CI, workspace-lock activation, documentation aggregation, installed-artifact tests, clean-chat/owner drills, and reviewed cutover. Publication of a repository is not completion of these gates.

4. Finish compiler-owned extension contracts

Complete these as separately testable increments; advertise each capability only when its own library, protocol, and integration tests pass:

  1. Contextual installed-package completion in imports, exports, qualified names, types, and member access; safe import edits, alias collisions, missing-source navigation, and multi-root behavior.
  2. Production Sagan DAP launch: reliable Sagan scopes and values, source-mapped failures, breakpoint/step/termination coverage, cancellation, child-process cleanup, and packaged debugger dependencies. Keep attach and optimized-local evaluation false unless separately proven.
  3. Complete compiler-owned sagan.toml document tooling beyond its initial overlay diagnostics, section/key and application-mode completion, and section/key hover and outline; finish remaining analysis cancellation checkpoints, as described in the extension roadmap.

Visible finish line: the running server advertises only tested package and debugger capabilities; the release payload contains the executable and native dependencies that those capabilities require. The separate extension work then consumes those contracts, rebuilds its VSIX, and passes isolated activation, live-host, and cross-platform smoke tests. Marketplace publication remains an optional later decision.

5. Complete the unified Sagan error experience

Retain the agreed friendly error style while covering lexical, parse, semantic, type, module, project, build, and runtime failures. Give each case a stable code, source location, concise explanation, safe hint when available, and Sagan-level traceback for runtime failures. Terminal and editor rendering must share structured compiler diagnostics rather than separate error logic.

Visible finish line: representative failure fixtures produce consistent CLI, LSP, and runtime output without raw native implementation messages. This is explicitly deferred until the extension-contract milestone is stable.

6. Audit documentation with the owner

The existing pages remain work-in-progress until Joe's page-by-page review. First reconcile stale version/status claims with the tested implementation, then review the tour and reference as a newcomer would use them. The audit may produce documentation fixes or concrete compiler issues; it does not silently change language semantics. See the documentation audit plan.

Visible finish line: every page has an explicit reviewed status and publication-ready pages pass the documentation release check.

7. Complete Windows distribution acceptance

Resume the SignPath Foundation application when a decision arrives. Set up trusted Authenticode signing if accepted, then test the exact signed candidate on a clean Windows x64 machine or VM: install, CLI, generated programs, Explorer launch, upgrade, downgrade refusal, and uninstall. Record hashes and results as required by the installer gate.

Visible finish line: a signed, clean-machine-verified Windows release candidate. Linux, macOS, Windows ARM64, and package-manager distribution remain separate later milestones.

Later language and library work

The two-body, restricted-three-body, and solar/Lagrange demonstrations are implemented; they are not still waiting in this queue. Future library work is deliberately incremental: a portable renderer backend (SDL3 before a GPU/UI expansion), broader math and physics APIs, and only then more advanced models. The language backlog includes coordinate-frame typing, spherical arithmetic/conversion, advanced unit categories, package installation and remote distribution, and contextual self capture. Each requires its own design and observable demo before being promoted into this active queue. Late-bound self.member dependencies in face defaults are a separate object-model increment. The current inheritance work does not implement them; the implementation checkpoint records the type-checking, lowering, dispatch, diagnostic, and tooling work required before this can be advertised.